FACTORY-FINISHED
MODULES
ENCLOSED AREA
PLUS TERRACE
PRODUCTION
PERIOD
ON-SITE
ASSEMBLY
Two ground-floor modules form reception, office, meeting and bathroom zones. The third module sits above them with the kitchen and dining area, opening to a terrace supported over the ground-floor roof.
Water and electrical routes were prepared in the factory. Onsite, the modules could be positioned, interfaces connected junctions aligned and seams sealed.
Full thermal-break detailing and 150 mm six-sided sprayed polyurethane insulation reduce cold bridges, supported by triple insulated glazing and active freeze protection.
PEOPLE IN THE
DAILY TEAM
ENCLOSED OFFICE
PLUS TERRACE
COMPLETE ON-SITE
ASSEMBLY
Monday – Friday: 8:30Am – 5:30PM
+86 199 5397 1301
Bancheng Town Industrial Zone,Lanshan District, Linyi City, Shandong,China
angela@aesthedge.com
© Shandong Compass Decor Material Co.,Ltd 2025.All Rights Reserved – Privacy Policy